The Chinese Environmental Protection Industry

  • An In-depth Study of Hazardous Waste Treatment,
  • Technologies and Projects-

120 Pages, Incl. Tables and Graphs; Beijing, 1996
The study has been undertaken by ECI Enzo Consult International GmbH, the predecessor of ECI SinoHTrust. Although dating back three years, most of the findings are valid up to day. The original is written in German language and covers the subject in all its legal and practical aspects as you may see from the attached table of contents.

We would like to make you two offers for purchase:

  1. A mailed copy of the original at USD$ 290.-
  2. A translated and updated version, paying specific attention to those areas which you would like to have covered extensively: USD$ 2,500.-USD$ 2,500.-

In case you'd like to order please don't forget to insert ref. no. CEPI-2-1.¡¡

Table of Contents

Preface
1.Introduction
1.1 The Chinese Definition of Hazardous Waste
1.2 Chinese Laws and Regulations for the Control of Solid and Hazardous Waste
1.3 The Present Stage of Hazardous and Solid Waste Pollution
1.4 Problems in Preventing Hazardous Waste Pollution 2.Present Hazardous Waste Treatment Technologies and Equipment
2.1 Hazardous Waste Recycling
2.2 Incineration Technologies and Equipment
2.3 Landfill Technologies
3.Market Analysis for Hazardous Waste Treatment Technologies
3.1 Introduction
3.2 Solid Waste Recycling
3.3 Incineration
3.4 Landfills
4.Proposals for A Market Entry and Development Strategy
4.1 Software
4.2 Products and Equipment
4.3 Projects¡¡

Attachments
Attachment I: Chinese Law for Solid Waste Prevention
Attachment II: Solid Waste Data from Key Cities

1.Beijing
1.1 Present Stage of Hazardous Waste Production
1.2 Hazardous Waste Volume Development Forecast
1.3 Projects and Measurements
1.4 Budgets
2.Shenyang 3.Jiangsu Province
3.1 Information on the Hazardous Waste Situation in Zhenjiang City
3.2 Wuxi
4.Shanghai
5.Guangzhou
6.Chongqing

Attachment III: Foreign Waste Incineration Technologies Available in China
1.Introduction
2.Equipment
3.Economical Performance

Attachment IV: Project Proposal for A 2'3 MW Waste Treatment and Power Generation Plant
1.Introduction
1.1 Preferential Conditions and Policies
1.2 Preferential Policies and Conditions in the Pearl River Delta
1.3 Project Data
1.4 Market Perspective for Combined Waste Incineration and Power Plants 2.Comparative Equipment Study
3.Investment and ROI Evaluation for the TOPS System
3.1 Project Data and Total Investment
3.2 Annual Sources of Income

Attachment V: Project Proposal Waste Treatment Center, Lanzhou
1.Introduction
2.Project Information
3.Budgets
4.Equipment List
5.Waste Collection

Attachment VI: Industrial Waste Treatment in Shenyang
Attachment VII: Key Economical Data

Contact Us  Tel: 8610-67738115/6/7  Fax: 8610-67738119